dc.identifier.citationKaracigan, A., Ozorhon, B., & Caglayan, S. (2023). A SYSTEMATIC APPROACH TO INVESTIGATE BIM IMPLEMENTATION IN TURKISH CONSTRUCTION INDUSTRY. Journal of Information Technology in Construction, 28, 306-321. doi:10.36680/J.ITCON.2023.015en_US
dc.identifier.urihttps://hdl.handle.net/20.500.14002/1995
dc.description.abstractArchitectural, engineering, and construction (AEC) industry is currently in a transition process that deeply affects the long-established way of collaboration and building information modelling (BIM) is at the centre of this transition. Achieving the smooth integration of BIM in construction projects requires companies to spend great effort and resources. In that sense, it is crucial to generate a comprehensive list of critical success factors (CSFs) of BIM adoption. This study aims to systematically identify the CSFs of BIM implementation in the construction phase and evaluate their effectiveness on real projects for Turkish construction industry. Within this context, an extensive literature review was conducted and CSFs were identified. The number of times each factor had been cited in the literature was recorded as the frequency. A comprehensive framework with 6 components was utilized including drivers, inputs, enablers, barriers, benefits and impacts. The identified CSFs were assigned to relevant components based on their contents. In an attempt to distinguish the responsibilities of the industry, firms, and project teams; each factor was categorized into three levels of influences (industry-, firm-, and project-level). A case study was employed to examine the effectiveness of each factor in practice through conducting interviews with the practitioners of 18 different construction projects. The interviewees were asked to specify the effectiveness of each factor in a 1-5 Likert Scale based on their experience in that particular project. This study is expected to promote BIM implementation in the construction industry and inform the industry professionals about the most significant factors to focus on. Further research may utilize the framework to conduct similar studies in different countries. COPYRIGHT: © 2023 The author(s). This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International (https://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.en_US
dc.language.isoengen_US
dc.publisherInternational Council for Research and Innovation in Building and Constructionen_US
dc.relation.ispartofJournal of Information Technology in Constructionen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectArchitectural design; Construction; Information theory; Building information modeling; Building information modeling integration; Building Information Modelling; Case-studies; Critical success factor; Model implementation; Models integration; Success factors; Turkish construction industries; Construction industryen_US
dc.titleA SYSTEMATIC APPROACH TO INVESTIGATE BIM IMPLEMENTATION IN TURKISH CONSTRUCTION INDUSTRYen_US
dc.typearticleen_US
dc.authorid0000-0003-2052-0954en_US
dc.departmentMeslek Yüksekokulları, Sakarya Meslek Yüksekokulu, İnşaat Teknolojisi Programıen_US
dc.institutionauthorCaglayan, Semih
dc.identifier.doi10.36680/J.ITCON.2023.015en_US
dc.identifier.volume28en_US
dc.identifier.startpage306en_US
dc.identifier.endpage321en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.authorscopusid57203128356en_US
dc.identifier.scopus2-s2.0-85157963379en_US


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster